GMW Connections Project – Waaia (Vic)

2020

Client: John Holland
Value: $530k
Commencement: May 2019

Overview:
– Installation of new 1.7km MV 15B/6 Principal Pipeline (DN710-DN315) and fittings.
– Installation of 4 new Closed Conduit Meter Outlets on principal pipeline.
– Supply and Installation of 2 new Stock and Domestic Outlets on principal pipeline.
– MV 15B/6, MV 1/15B/6 GMW Channel Decommissioning to locations as identified on the drawings.
– Decommission and removal of 1 single bay regulator offtake structure.
– Decommission and removal of 2 single bay regulators.
– Decommission and removal of 1 outfall regulators.
– Decommission and removal of 1 occupational crossing structures.
– Decommission by remove headwall and grout filling of 1 road crossing culvert.
– Supply and installation of Type B offtake structure as per drawings and specifications.
– Decommission and removal of 6 Dethridge wheel meters and associated outlet structures.
– Site reinstatement