Skip to main content

Time Lapse Footage of Gladstone Water Main Project

2014

Time Lapse footage of the installation of the 300mm MSCL Water Main in Gladstone, QLD.

Our Innovative Construction Methodology involved the use of a series of rollers & a flying fox system to allow the pipe to be both welded & launched from the Southern Bank of the Cooling Water Channel, this allowed the traffic to flow uninterrupted during the construction phase to the RG Tanna Coal Terminal.

See the Time Lapse Video below.