GMW Connections Project – Echuca (Vic)
Project Name: Goulburn Murray Water Connections Project – Echuca (Vic)
Client: John Holland
Value: $450k
Commencement: April 2019
Overview:
– Installation of new 1.2km RO 3A/14 Principal Pipeline (DN710 & DN630) and fittings.
– Installation of 2 new Closed Conduit Meter Outlets on principal pipeline.
– Supply and Installation of 3 new Stock and Domestic Outlets on principal pipeline.
– RO 3A/14 GMW Channel Decommissioning.
– Decommission and removal of 1 single drop bar regulator.
– Decommission and removal of 2 occupational crossing structures.
– Decommission and removal of 1 road crossing culvert.
– Supply and installation of Type B offtake structure as per drawings and specifications.
– Decommission and removal of 2 Dethridge wheel meters and associated outlet structures.
– Site reinstatement