Offaly Civil Engineering Pty. Ltd. were engaged by Hunter H20 for the installation HDPE pipe work & electrical conduits for the Shortland Waste Water Treatment Plant Upgrade. Hunter H20 is implemented a program involving the improved management of sludge at Shortland Wastewater Treatment Works (WWTW) to cater for the upgraded plant capacity to 12 ML/d.
The overall works required the construction of a number of new pipelines to facilitate the movement of reclaimed water, sludge and potable water around the site.

Overview:

Installation of 200m of DN315 PN16 HDPE Digester Gravity main from New De-watering facility to Ponds.

  • Installation of 350m of DN180 HDPE Rising Main.
  • Installation of 350m Electrical Conduits (Bank of 8no. 90mm HD Conduits in Shared trench)
  • Installation of 14no. Precast electrical pits.
  • Cast in-situ construction of Reinforced concrete High Voltage Metering Slab & Electrical Kiosk Pit.
  • Auger boring of Piles for HV Metering Slab.
  • Hydrostatic Testing & Commissioning.
  • Re-habilitation of project site.

Related Projects

Driving progress across Southeast Queensland

View Projects

    Noosa (QLD)

    Noosa Landfill Western Batter Missing link Capping and RRA Pad Project

    Gympie (QLD)

    Station Road Signalisation Project

    Gympie (QLD)

    Water Network Water Main Renewal Project D&C

    Caloundra (QLD)

    Gagalba P18 sewer pumpstation

    Mundubbera (QLD)

    Mundubbera Landfill Expansion Project

    Gympie (QLD)

    G3 Pumpstation Relocation Project

    Gympie (QLD)

    Southside Sewer Stage 9 & 10

    Gympie (QLD)

    G1 Pump Station Relocation Project

    Gympie (QLD)

    Bonnick Road Eastern Cell Landfill Project