G3 Pumpstation Relocation Project

project commencement date: April 2024

Project Budget

$3.3M

Project Location

Gympie (QLD)

Overview:

  • Construction of 3m diameter 9mm deep pre-cast HDPE lined reinforced concrete pump station structure.
  • Construction of new collection manhole, Valve pit and flow meter pit.
  • mechanical fit-out of pump station.
  • Trenchless (Micro-tunnel) construction of DN375 DICL rising main.
  • Trenchless (Micro-tunnel) construction of DN375 PVC incoming gravity main.
  • Installation of 1no. 55,000 L emergency storage tank.
  • Construction of reinforced concrete car park.
  • Demolition of existing above ground G3 pump station structure.
  • Testing and commissioning.
  • Live connection to existing sewer infrastructure.

Related Projects

Driving progress across Southeast Queensland

View Projects

    Gympie (QLD)

    Station Road Signalisation Project

    Gympie (QLD)

    Water Network Water Main Renewal Project D&C

    Caloundra (QLD)

    Gagalba P18 sewer pumpstation

    Mundubbera (QLD)

    Mundubbera Landfill Expansion Project

    Gympie (QLD)

    Southside Sewer Stage 9 & 10

    Gympie (QLD)

    G1 Pump Station Relocation Project

    Gympie (QLD)

    Bonnick Road Eastern Cell Landfill Project

    Biloela (QLD)

    Dee Street Rising Main & Septage Receival Station (D&C)

    Blackbutt (QLD)

    Les Muller Park Upgrade