  • Installation of new 1.7km MV 15B/6 Principal Pipeline (DN710-DN315) and fittings.
  • Installation of 4 new Closed Conduit Meter Outlets on principal pipeline.
  • Supply and Installation of 2 new Stock and Domestic Outlets on principal pipeline.
  • MV 15B/6, MV 1/15B/6 GMW Channel Decommissioning to locations as identified on the drawings.
  • Decommission and removal of 1 single bay regulator offtake structure.
  • Decommission and removal of 2 single bay regulators.
  • Decommission and removal of 1 outfall regulators.
  • Decommission and removal of 1 occupational crossing structures.
  • Decommission by remove headwall and grout filling of 1 road crossing culvert.
  • Supply and installation of Type B offtake structure as per drawings and specifications.
  • Decommission and removal of 6 Dethridge wheel meters and associated outlet structures.
  • Site reinstatement.

Related Projects

Driving progress across Southeast Queensland

View Projects

    Noosa (QLD)

    Noosa Landfill Western Batter Missing link Capping and RRA Pad Project

    Gympie (QLD)

    Station Road Signalisation Project

    Gympie (QLD)

    Water Network Water Main Renewal Project D&C

    Caloundra (QLD)

    Gagalba P18 sewer pumpstation

    Mundubbera (QLD)

    Mundubbera Landfill Expansion Project

    Gympie (QLD)

    G3 Pumpstation Relocation Project

    Gympie (QLD)

    Southside Sewer Stage 9 & 10

    Gympie (QLD)

    G1 Pump Station Relocation Project

    Gympie (QLD)

    Bonnick Road Eastern Cell Landfill Project