Gladstone Water Main Project

project commencement date: April 2014

Project Budget

$0.75M

Project Location

Gladstone (QLD)

Overview:
The Gladstone Ports Corporation requires the installation of a new water main along Alf O’Rourke Drive to provide future services to the proposed commercial development area on the western side of Alf O’Rourke Drive from the cooling water channel to Bryan Jordan Drive. Furthermore, this new water main will create a looped water feed to the marina and RGT Coal Terminal improving the water supply to these areas:

  • Installation of 5.0 km of DN355 PE100 Sewer main.
  • Installation of 200m of DN300 DICL Water Main.
  • Installation of 100m of DN324 MSCL (Band Welded) Water Main.
  • Construction of pre-cast Concrete access chambers.

Time Lapse footage of the installation of the 300mm MSCL Water Main in Gladstone, QLD.

Our Innovative Construction Methodology involved the use of a series of rollers & a flying fox system to allow the pipe to be both welded & launched from the Southern Bank of the Cooling Water Channel, this allowed the traffic to flow uninterrupted during the construction phase to the RG Tanna Coal Terminal.

See the Time Lapse Video below.

Related Projects

Driving progress across Southeast Queensland

View Projects

    Noosa (QLD)

    Noosa Landfill Western Batter Missing link Capping and RRA Pad Project

    Gympie (QLD)

    Station Road Signalisation Project

    Gympie (QLD)

    Water Network Water Main Renewal Project D&C

    Caloundra (QLD)

    Gagalba P18 sewer pumpstation

    Mundubbera (QLD)

    Mundubbera Landfill Expansion Project

    Gympie (QLD)

    G3 Pumpstation Relocation Project

    Gympie (QLD)

    Southside Sewer Stage 9 & 10

    Gympie (QLD)

    G1 Pump Station Relocation Project

    Gympie (QLD)

    Bonnick Road Eastern Cell Landfill Project