C2C Project Drainage Installation

project commencement date: January 2021

Project Budget

$1.9M

Project Location

Gympie (QLD)

Overview:

  • Early works water main re-location for Penny Road Cut.
  • Installation of reinforced concrete pipe culverts ranging from DN375 to DN1800.
  • Installation of Box culvert segments ranging from 600mm x 450mm to 3m x 3m.
  • Form / Fix / Pour approximately 800 cum of reinforced concrete base slabs and end structures.

Related Projects

Driving progress across Southeast Queensland

View Projects

    Noosa (QLD)

    Noosa Landfill Western Batter Missing link Capping and RRA Pad Project

    Gympie (QLD)

    Station Road Signalisation Project

    Gympie (QLD)

    Water Network Water Main Renewal Project D&C

    Caloundra (QLD)

    Gagalba P18 sewer pumpstation

    Mundubbera (QLD)

    Mundubbera Landfill Expansion Project

    Gympie (QLD)

    G3 Pumpstation Relocation Project

    Gympie (QLD)

    Southside Sewer Stage 9 & 10

    Gympie (QLD)

    G1 Pump Station Relocation Project

    Gympie (QLD)

    Bonnick Road Eastern Cell Landfill Project