Overview:
- Supply and installation of 480m (DN300-DN150) PVC bypass pipelines.
- Site fabrication and installation of 8 x DN1200 in-situ sewer manholes.
- Decommissioning and demolition of pump station structures G5 and G5A.
- Construction of concrete apron for creek crossing.
- Implementation of non-destructive hydrovac trenching through tree protection zones.
- Reinstatement of asphalt pavement for road crossings.










