Rainbow Beach and Cooloola Cove Sludge Handling Pads Project

project commencement date: January 2026

Project Budget

$1.5M

Project Location

Rainbow Beach

Overview:

Design and construction of reinforced concrete sludge handling facilities at both the Cooloola Cove and Rainbow Beach sewer treatment plants; scope included:

  • Detailed design of sludge handling pads
  • Bulk earthworks and subgrade preparation
  • Construction of reinforced concrete sludge handling pads:
    • Rainbow Beach: 1700 sqm
    • Cooloola Cave: 850 sqm
  • Design and installation of interconnecting pipework and services
  • Site restoration