GMW Connections Project – Waaia (Vic)

Client: John Holland
Value: $530k
Commencement: May 2019

Overview:

  • Installation of new 1.7km MV 15B/6 Principal Pipeline (DN710-DN315) and fittings.
  • Installation of 4 new Closed Conduit Meter Outlets on principal pipeline.
  • Supply and Installation of 2 new Stock and Domestic Outlets on principal pipeline.
  • MV 15B/6, MV 1/15B/6 GMW Channel Decommissioning to locations as identified on the drawings.
  • Decommission and removal of 1 single bay regulator offtake structure.
  • Decommission and removal of 2 single bay regulators.
  • Decommission and removal of 1 outfall regulators.
  • Decommission and removal of 1 occupational crossing structures.
  • Decommission by remove headwall and grout filling of 1 road crossing culvert.
  • Supply and installation of Type B offtake structure as per drawings and specifications.
  • Decommission and removal of 6 Dethridge wheel meters and associated outlet structures.
  • Site reinstatement.