Project Name: Goulburn Murray Water Connections Project – Echuca (Vic)
Client: John Holland
Value: $450k
Commencement: April 2019
Overview:
- Installation of new 1.2km RO 3A/14 Principal Pipeline (DN710 & DN630) and fittings.
- Installation of 2 new Closed Conduit Meter Outlets on principal pipeline.
- Supply and Installation of 3 new Stock and Domestic Outlets on principal pipeline.
- RO 3A/14 GMW Channel Decommissioning.
- Decommission and removal of 1 single drop bar regulator.
- Decommission and removal of 2 occupational crossing structures.
- Decommission and removal of 1 road crossing culvert.
- Supply and installation of Type B offtake structure as per drawings and specifications.
- Decommission and removal of 2 Dethridge wheel meters and associated outlet structures.
- Site reinstatement.