Client: Gympie Regional Council
Value: $3.3M
Commencement: April 2024
Overview:
- Construction of 3m diameter 9mm deep pre-cast HDPE lined reinforced concrete pump station structure.
- Construction of new collection manhole, Valve pit and flow meter pit.
- mechanical fit-out of pump station.
- Trenchless (Micro-tunnel) construction of DN375 DICL rising main.
- Trenchless (Micro-tunnel) construction of DN375 PVC incoming gravity main.
- Installation of 1no. 55,000 L emergency storage tank.
- Construction of reinforced concrete car park.
- Demolition of existing above ground G3 pump station structure.
- Testing and commissioning.
- Live connection to existing sewer infrastructure.