Client: Gympie Regional Council
Value: $1.6M
Commencement: January 2023
Overview:
- Construction of 3m diameter 10m deep cast in-situ HDPE lined reinforced pump station structure.
- Construction of new collection manhole, Valve pit and flow meter pit.
- Mechanical fit-out of pump station.
- Construction of DN375 DICL rising main.
- Construction of DN375 PVC incoming gravity main.
- Installation of 3no. 70,000 L emergency storage tanks.
- Construction of reinforced concrete car park.
- Demolition of existing above ground G1 pump station structure.
- Testing and commissioning.
- Live connection to existing sewer infrastructure.