Client: John Holland
Value: $530k
Commencement: May 2019
Overview:
- Installation of new 1.7km MV 15B/6 Principal Pipeline (DN710-DN315) and fittings.
- Installation of 4 new Closed Conduit Meter Outlets on principal pipeline.
- Supply and Installation of 2 new Stock and Domestic Outlets on principal pipeline.
- MV 15B/6, MV 1/15B/6 GMW Channel Decommissioning to locations as identified on the drawings.
- Decommission and removal of 1 single bay regulator offtake structure.
- Decommission and removal of 2 single bay regulators.
- Decommission and removal of 1 outfall regulators.
- Decommission and removal of 1 occupational crossing structures.
- Decommission by remove headwall and grout filling of 1 road crossing culvert.
- Supply and installation of Type B offtake structure as per drawings and specifications.
- Decommission and removal of 6 Dethridge wheel meters and associated outlet structures.
- Site reinstatement.